Labor Tracking Reports Adjusted
($350)
These labor tracking reports can automatically
compute the time an employee was clocked in to the Labor Tracking system
during morning and
afternoon employee break time as well as lunch time. The morning break, afternoon break and lunch
starting time and duration are specified for each employee.
The report will compute if the employee was
clocked in during a break or lunch time and automatically compute the
adjustment time that should be deducted from the run hours. The actual run
time, adjustment time and net run time
are all displayed on the report.
This permits management to use the net run time
required to produce a product without having the employee clock out during
breaks or lunch time. Even if the employee's are paid for their breaks these
reports yield the actual net hours required to build the product.
|